Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Mar 07, 2020     10-13 step 3-8 TAILCONE Aft deck drilling - (4 hours)       Category: Fuselage
After checking alignement and position of all parts we positioned the clamps to keep the aft deck in position we we started drilling F-1010A HS attachment angle and the top side of the longerons. Clecoing as we proceed.
Marchdrilling all the other pars (stop, doublers),
Matchdrilled the #12 holes in the longerons.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.